Installation Instructions

Error! Use the Home tab to apply 标题 1 to the text that you
want to appear here.
6 FA50 Operation Manual
socket should not be blocked by any objects. In case of
emergency, the operator can easily pull out the power cord
from the socket to disconnect the power immediately.
2.The equipotential ground terminal at the rear panel of the
instrument must be connected with the ground cable, if
possible, connected to a dedicated ground cable. Users have
the obligation to ensure the reliability of the grounding power
supply at the instrument’s working site.
3.Frequent power failure will greatly degenerate the performance
and reliability of the instrument. Users should solve this
problem before the use, for example, choose the instrument’s
optional backup direct current power supply or equip the
Uninterruptible Power Supply (UPS) by themselves.
4.The operator should use the specified fuse.
5.Make sure the input voltage meets the instrument’s requirement.
2.3 Connection of the Analyzer
2.3.1 Unpacking and placing the analyzer
Open the dedicated packaging box of the analyzer and carefully
check if the analyzer and accessories in the box are consistent with
the packing list. If there is any loss or damage, please contact the
supplier immediately.