Owner's Manual
4.6
www.geniecompany.com 06-12
Drawbar Installation (continued)
2" X 6"
HEADER
MARK A HORIZONTAL LINE
5"
ABOVE HIGHEST POINT OF TRAVEL
LEVEL
HIGHEST POINT
OF TRAVEL
Figure 8
Figure 9
7) Raise the door end (idler pulley) of the drawbar while resting the operator
on the floor or other desired material.
8) Position the spreader bracket on your centerline with its bottom edge on
your horizontal mark. Fig. 9.
• Fasten spreader bracket to header using fasteners appropriate for the
header material.
Standard Duty Operator
GCL-T










