Owner's Manual
Medium Duty Operator
GCL-MT
4.
2
www.geniecompany.com 08-12
3) Insert the carriage into the tracks as shown in Fig. 3.
NOTE: One end of the carriage has a notch (Detail A) which will be
used to locate the chain pin (Detail B). This end of the carriage faces
the front spreader bracket and away from the power unit.
4) Attach the front spreader bracket to the front of the operator
tracks with two (2) track bolts and two (2) locknuts (check hole
alignment before installing).
5) Position the idler pulley inside the track and insert the
3/8" x 4-1/2" clevis pin. Secure the clevis pin using the
hitch pin. Fig. 4.
NOTE: Track bolts MUST be installed
from inside the track.
Drawbar Assembly (cont’)
Figure 3
CARRIAGE
TRACK
NOTCH
DETAIL A
DETAIL B
CHAIN
CHAIN
PIN
EXPLODED VIEW ASSEMBLED VIEW
CLEVIS PIN
LOCK NUT
FRONT
SPREADER
BRACKET
TRACK
BOLTS
LOCK
NUT
HITCH PIN
IDLER PULLEY
TRACK
Figure 4










