Owner's Manual

4.4
www.geniecompany.com 03-12
6) Uncoil the drawbar chain and install by routing the chain over the chain
guides (A) and around the drive sprocket (B) on the output shaft as shown
in Fig. 6.
7) Attach to Chain Tension Adjusting Bolt (C) using a master link (provided).
8) Pass the other end of the chain between the front spreader bracket and
the idler pulley (D). Make certain the chain is not twisted.
9) Attach the chain to the carriage (E) using a master link.
10) Insert the Adjusting Bolt through the hole in the Carriage and place the
tensioning spring, flat washer and adjusting nut onto the bolt. Detail A,
Fig 6.
11) Tighten Chain so that it will not jump a sprockets or pulley. Add locknut.
Check to ensure the following:
The chain is properly engaging the output sprocket.
The chain is not twisted.
WARNING
DO NOT apply line voltage until instructed to do so.
Drawbar Assembly (continued)
Detail A
CHAIN
TENSION
ADJUSTMENT
SCREW
FLAT WASHER
LOCKNUT
ADJUSTING NUT
TENSIONING
SPRING
MASTER
LINK
MASTER
LINK
Figure 6
A
C
D
E
B
Heavy Duty Operator
GCL-GT