Installation Manual
Page 4 of 8
www.generalspecialtiesmfg.com
208-265-5244
General Installation Instructions
Standard stock tee socket sized for 6” schedule 40 or 80 pipe.
Finger tighten onto "Tee" end plates, either the U-Bolts or aluminum flat bar and straight 1/2" bolts,
whichever come
with your mount. Place entire "Tee" assembly on top of post. The aluminum flat bar
and straight 1/2" bolts are shown in Detail “A”.
Slide cross pieces into U-Bolts or bolt and flat bar arrangement. Make sure locating lugs on cross
pieces are facing in.
See Detail “B” of locating lugs.
Place longitudinal tubes on top of cross pieces and bolt with square washers top and bottom.








