Repair Manual User Manual
GENERAL PUMP
A member of the Interpump Group
KF SERIES
3. SCREW CALIBRATION
Screws are to be fastened exclusively using a torque wrench.
Description
Exploded View
Position
(From Owner’s Manual)
Fastening
Ft. Lbs.
Fastening
Nm
Cover Fastening Screws 9 7.4 10
Plunger Fastening Screws 29 14.8 20
Connecting Rod Fastening Screws 16 28 38*
Head Fastening Screws 39 59 80**
Valve Cover Screws 40 88.5 120***
Lifting Bracket Fastening Screws 56 73.8 100
Oil Discharge Plug 11 29.5 40
Delivery Duct Plug
58 29.5 40
* The connecting rod fastening screws must be fastened simultaneously respecting the phases
indicated in Point D on page 6.
** The head fastening screws, exploded view position 39, must be tightened with a torque wrench,
lubricating the threaded stem with molybdenum disulphide grease part #F12001500, respecting
the order shown in the scheme in fig. 21.
*** The valve cover cover screws, exploded view position 40, must be tightened with a torque
wrench, lubricating the threaded stem with molybdenum disulphide grease part
#F12001500,respecting the order indicated in the scheme in fig. 21
Page 13
Ref 300917 Rev.A
12-12