Manual

Page 7 of 44
2.0 CRITICAL POINTS THAT DRAMATICALLY AFFECT THE
OPERATION OF THE CABLE BLOWING MACHINE
PRESSURE ON THE CABLE (POSITION OF THE CLOSE ARM ASSY) SHOULD BE SET AS
PER THE INSTRUCTIONS
BELTS TO BE CLOSED AT ALL TIMES WHEN CABLE IS INSTALLED INTO MACHINE.
CORD SEALS IN AIR CHAMBER IN GOOD CONDITION AND CORRECTLY INSTALLED TO
PROVIDE GOOD SEALING.
CORRECT CABLE SEAL INSTALLED.
TUBE FULLY CONNECTED AND PRESSURE-TESTED.
TUBE AND CONNECTING FITTINGS ARE SUITABLE FOR OPERATING AT 15 BAR AIR
PRESSURE.
TUBE CLAMP SECURELY TIGHTENED.
COMPRESSOR CAPACITY 15 BAR AND SUITABLE FOR SIZE OF TUBE BEING USED.
CABLE DRUM MUST BE LOCATED DIRECTLY BEHIND AND IN LINE WITH THE BLOWING
MACHINE.
AIR CHAMBER, DRIVE BELTS AND PULLEYS, CABLE GUIDES, MUST BE CLEAN AND
FREE FROM DEBRIS, SLUDGE, DIRT, WATER AND LUBRICANT.
THE CABLE MUST BE HAND GUIDED INTO THE BLOWING MACHINE THROUGH A DRY
CLEAN CLOTH BY THE OPERATOR WEARING WORK GLOVES.
ENSURE THE COMPRESSED AIR SUPPLY IS NOT APPLIED TO THE CABLE UNTIL
APPROXIMATELY 150 FEET OF CABLE HAS BEEN INSTALLED OR THE MOTOR BEGINS
TO LABOR.