Installation Manual
DRAFT COPY
NOMAD MXU Installation Manual
3:36 PM 02/12/99
DRAFT COPY
26
If not the MXU will not function.
Check 7: Verify all four phone lines, can make modem calls between the users location and
the Gateway. ________________________________________________________
If not, the MXU can not be controlled from the gateway and must be configured
at the factory.
POWER
Check 8: Verify the Power Voltage is 90 to 135 VAC, 47 to 63Hz,: or,
180 to 265VAC, 47 to 63 Hz____________________________________________
if one of these two voltages is not available, the MXU will not work.
Check 9: TO REDUCE THE RISK OF ELECTRIC SHOCK, HAVE A CERTIFIED ______
ELECTRICAN VERIFY THE POWER OUTLET IS CORRECTLY GROUNDED.
If the outlet is not properly grounded, have the electrician replace it.
Check 10 Verify the correct AC Power Cord has been ordered_________________________
If a power cord was not specified, the user will receive the power cord
illustrated below.
The correct power cord is the responsibility of the user. A possible source of power
cords can be contacted at the following website. http://www.panelcomponents.com
MONITOR STATION (Optional, User Supplied)
Check 11, Verify the configuration of the Monitor Station PC (user supplied) ____________
IBM compatible a Pentium class PC
at least 50 MB of free disk space,
Microsoft NT 4.0 installed
NT Service Pack Three installed
CDROM drive (required to install the NOMAD MCM program)_______________
Check 12: Verify, Null Modem Cable per following schematic. (user supplied)___________
Transmit Data (2)
Receive Data (3)
Request To Send (7)
Clear To Send (8)
Data Set Ready (6)
Ground (5)
Data Carrier Detect (1)
Data Terminal Ready (4)
(2) Transmit Data
(3) Receive Data
(7) Request To Send
(8) Clear To Send
(6) Data Set Ready
(5) Ground
(1) Data Carrier Detect
(4) Data Terminal Ready
Building
Ground
Wide Blade
110VAC_Low
Narrow Blade
110VAC_High
MXU
Connector
To Wall Outlet