6. Installation
This section describes the steps to be followed to physically install the Node B.
Step 1- Pre-Installation
This section describes the initial checks that should be carried out to ensure that preparation
for the installation is complete.
For Installation Check Card please see Appendix A at the back of this manual.
1. Review site construction drawings to determine if site was constructed
according to the drawings.
2. Review drawings and actual installation to determine location of Node B
installation.
3. Check availability of electrical, grounding and antenna connections.
4. Complete site survey.
5. Check structural strength of wall, pole or mounting frame to support Node B
weight of 25Kgs (55lbs).