Installation Guide
Node B Installation Guide
Version 5.0.0 Page 12 of 15
In addition to standard construction equipment, the following tools and materials should be
available prior to installation:
Table 6-2 : Tools Required
Tools Description
Access Tool
Tool for Node B service area access
Drill and Drill Bits M6 or No8 Masonry Drill Bit
Voltmeter Fluke meter
Alarm Cable Insertion Tool 1mm flat blade Screwdriver
Basic telecommunications tool kit Includes screwdriver, socket wrenches, etc.
Cable Stripper & Crimper RJ 45 crimper connector
Ethernet cable test set Test for all Ethernet cables
Compass or Handheld GPS with signal indicator Test for GPS signal at site location
Table 6-3 : Materials Required
Material
Description
Armoured conduit- UL-1211
Ducting UL rated 12x18mm Diameter
Cable conduit attached to cable glands
CAT5 - 4 pair, double screened cable, recommended
Alcatel LANmark-5 F
2
TP or equivalent
IUB / LMT / T1 / E1 Cable
RJ45 Connectors IUB / LMT / T1 / E1 Connections
CSA 7mm
2
or Ø3mm or 9AWG (Max) for each
2 core power cable
DC Power Cable 2 core
CAT5 - 4 pair, double screened cable, recommended
Alcatel LANmark-5 F
2
TP or equivalent
Alarm distribution cable
10 mm2 maximum Ground cable Grounding termination
M10 ring terminal Grounding termination
BNC Right Angle Connectors Connectors for E3/T3 Connections
RG59 B/U-LSF and UV stabilised or equivalent Cable for E3/T3 Connections