- 1 OVERVIEW
- 2 PRE-INSTALLATION
- (Step 3) MOUNTING THE NODE B BRACKET
- 4 Site Preparation for Node B Installation
- 5 (Step 10) PHYSICAL INSTALLATION OF THE NODE B
- 5.1 Placing the Node B into the Rack
- 5.2 Service Area Interfaces
- 5.3 (Step 6) Grounding Installation and Inspection
- 5.4 Cable Clamp Seal
- 5.5 Connecting Power to the Node B
- Backhaul Connections to INC
- 5.7 Alarm Connections
- 5.8 Replacement of the Seal cable clamp
- 5.9 Conduit Pivot Bracket Securing
- 5.10 Closing the Door and securing the NodeB
- 5.11 GPS
- 6 (Step 11) Power up and Initial Setup of Node B
- 8
- 8 (Step 12) SOFTWARE INSTALLATION
- 9 (Step 13) On Air final check
- 10 Operation & Maintenance
Node B Installation Guide
DRAFT
17 July, 2001 IPWireless Proprietary
IT IS ILLEGAL TO MAKE COPIES OF THIS DOCUMENT WITHOUT EXPRESS PERMISSION BY IPWIRELESS
4
5.4 Cable Clamp Seal............................................................................................................ 25
5.5 Connecting Power to the Node B................................................................................... 25
5.5 Connecting Power to the Node B................................................................................... 26
5.6 Backhaul Connections to INC........................................................................................ 27
5.7 Alarm Connections ......................................................................................................... 30
5.8 Replacement of the Seal cable clamp ............................................................................ 31
5.9 Conduit Pivot Bracket Securing.................................................................................... 32
5.10 Closing the Door and securing the NodeB.................................................................... 32
5.10 Closing the Door and securing the NodeB.................................................................... 33
5.11 GPS................................................................................................................................... 34
6 (STEP 11) POWER UP AND INITIAL SETUP OF NODE B ..................................35
8 (STEP 12) SOFTWARE INSTALLATION..............................................................37
9 (STEP 13) ON AIR FINAL CHECK........................................................................37
10 OPERATION & MAINTENANCE........................................................................37
10.1 Maintenance .................................................................................................................... 37