User Manual
Table Of Contents
- IMPORTANT
- Legal Terms Governing This Document
- 1 OVERVIEW
- 2 PRE-INSTALLATION
- (Step 3) MOUNTING THE NODE B BRACKET
- 4 Site Preparation for Node B Installation
- 5 (Step 10) PHYSICAL INSTALLATION OF THE NODE B
- 5.1 Placing the Node B into the Rack
- 5.2 Service Area Interfaces
- 5.3 (Step 6) Grounding Installation and Inspection
- 5.4 Cable Clamp Seal
- 5.5 Connecting Power to the Node B
- Backhaul Connections to INC
- 5.7 Alarm Connections
- 5.8 Replacement of the Seal cable clamp
- 5.9 Conduit Pivot Bracket Securing
- 5.10 Closing the Door and securing the NodeB
- 5.11 GPS
- 6 (Step 11) Power up and Initial Setup of Node B
- 8
- 8 (Step 12) SOFTWARE INSTALLATION
- 9 (Step 13) On Air final check
- 10 Operation & Maintenance
Node B Installation Guide
DRAFT
17 July, 2001 IPWireless Proprietary
IT IS ILLEGAL TO MAKE COPIES OF THIS DOCUMENT WITHOUT EXPRESS PERMISSION BY IPWIRELESS
20
The conduits must be fixed to the brackets prior to fixing the bracket to the wall.
Leave a sufficient loop of cables to enable them to be prep’d back to the appropriate length.
The following figure specifies the way the conduit bracket glands have been designated
signifying which cables should be fed thru which gland.
The glands and conduit should be fitted to the mount bracket prior to the NodeB being mounted
onto to the mounting bracket.
The cable should be fed thru the glands and the glands ‘sealed’ prior to the NodeB being
mounted onto to the mounting bracket. Excess cable should be fed thru.
The cables should be secured to the conduit bracket strain relief.
Looped
Cable
Power
T1 x 2
T1 x 2
or
Ethernet x1
L
N
A
Al
a
rm
s