Install Manual
Table Of Contents
- Table of Contents
 - Section 1: Safety
 - Section 2: General Information
 - Section 3: Installation
 - Section 4: Operation
 - Section 5: Drawings and Diagrams
- Installation Drawing—100A SE & Non-SE/150-200A Non-SE
 - Installation Drawing—150/200A SE
 - Installation Drawing—Liquid Cooled Generator
 - Installation Drawing—Liquid-Cooled Generator
 - Installation Drawing—Air-Cooled Generator SE and Non-SE Rated ATS
 - Installation Drawing—Air-Cooled Generator SE and Non-SE Rated ATS
 
 
Installation
10 Automatic Transfer Switch Owner’s Manual
Figure 3-1. Open Enclosure
Connecting Power Source and 
Generator Power Supply
Installation and interconnection diagrams are provided in
this manual. 
NOTE: All installations must comply with national, state
and local codes. It is the responsibility of the installer to
perform  an  installation  that  will  pass  the  final  electrical
inspection.
1. Connect  utility  supply  at  the  utility  service
disconnect  circuit  breaker  terminals  N1  and  N2.
Follow  torque  specifications  listed  on  the  circuit
breaker.
2. See Figure 3-2. Connect utility neutral and ground
to the Upper Neutral and Ground terminals. Neutral
and  Ground  terminals  are  bonded  to  each  other
with a jumper wire (A).
NOTE:  Neutral  to  Ground  jumper  wire  (A)  is
provided for use if required by local codes.
3. Connect  generator  to the  generator terminals (E1
and E2) on the transfer mechanism.
4. Connect  the  generator  neutral  wire  to  the  lower
neutral lug.
IMPORTANT  NOTE:  A  jumper  wire  (B)  bonds
the  upper  and  lower  Neutral  lugs.  NEVER
remove this wire.
5. Connect  a  subpanel  supply  to  lower  T1  and  T2
Terminals. Connect  subpanel Neutral and Ground
to lower Neutral and Ground bars. 
Conductor  sizes  must  be  adequate  to  handle  the
maximum current to which they will be subjected, based
on  the  75°C  column of  tables,  charts,  etc.  used  to  size
conductors.  The  installation  must  comply  fully  with  all
applicable codes, standards and regulations.
Knockouts  into  the  transfer  switch  can  be  made  in  the
field  as  needed  for  entry  of  power  cables  and  conduit.
Conduit  entry  shall  maintain  the  proper  wire  bending
spaces required by Tables 312.6 (A) and (B) in the NEC.
Conduits  should  be  arranged  to  provide  separation
between  the  Utility  and  Generator  supply  conductors
inside the enclosure. 
D
E
B
A
C
J
H
F
G
(000116)
DANGER
Electrocution. Turn utility and emergency 
power supplies to OFF before connecting 
power source and load lines. Failure to do so 
will result in death or serious injury.