Installation Guide

9
Gas Actuator
Primary Regulator
(Supplied by
Installing
Contractor)
Flex Fuel Line
(Supplied
with Unit)
Generator Base
Fuel Shutoff/Regulator
Assembly
Manual Shutoff Valves
Fuel
Tank
11 - 14” Water Column
Recommended (> = 70kW)
5 - 14" Water Column
Recommended (< 70kW)
Figure 1.11 — Typical LP Gas Vapor Withdrawal System
Gas Actuator
Primary Regulator
(Supplied by
Installing
Contractor)
11 - 14” Water Column
Recommended (> = 70kW)
5 - 14" Water Column
Recommended (< 70kW)
Flex Fuel Line
(Supplied
with Unit)
Generator Base
Fuel Shutoff/Regulator
Assembly
Manual Shutoff
Valve
Figure 1.10 — Typical Natural Gas System
General Information