Installation Guide
Electrical Connections
34 Installation Guidelines For Australian 50 Hz Air-Cooled Generators
NOTE: See Figure 6-2. Battery cables were factory
connected at the generator. Connect cables to battery
posts as follows:
4. Connect the red battery cable (A: from starter
contactor) to the battery post indicated by a
positive: POS or (+). Torque to 8 Nm (70 in-lbs).
Figure 6-2. Battery Cable Connections
5. Connect the black battery cable (B: from frame
ground) to the battery post indicated by a negative:
NEG, or (-). Torque to 8 Nm (70 in-lbs).
6. Install the red battery post cover (shipped with
loose parts).
NOTE: Dielectric grease should be used on battery
posts to aid in the prevention of corrosion.
NOTE: Damage will result if battery connections are
made in reverse.
NOTE: In areas where temperatures fall below -18 °C
(0 °F), it is recommended that a pad type battery warmer
be installed to aid in cold climate starting. This is
available as part of a cold weather kit through an
Independent Authorized Service Dealer (IASD).
A battery warmer is not necessary for AGM-style batter-
ies.
Battery Disposal
Always recycle batteries in accordance with local laws
and regulations. Contact your local solid waste collection
site or recycling facility to obtain information on local
recycling processes. For more information on battery
recycling, visit the Battery Council International website
at: http://batterycouncil.org
–
+
B
A
001832
WARNING
Environmental Hazard. Always recycle batteries at an
official recycling center in accordance with all local
laws and regulations. Failure to do so could result in
environmental damage, death or serious injury.
(000228)