Installation Guide
Table Of Contents
- Installation Guidelines 60 Hz Air-Cooled Generators
- Table of Contents
 - Section 1: Safety Rules & General Information
 - Section 2: Unpacking and Inspection
 - Section 3: Site Selection and Preparation
 - Section 4: Generator Placement
 - Section 5: Fuel Conversion / Gas Connections
 - Section 6: Electrical Connections
 - Section 7: Control Panel Startup / Testing
 - Section 8: Troubleshooting
 - Section 9: Quick Reference Guide
 - Section 10: Accessories
 - Section 11: Diagrams
 
 

Fuel Conversion / Gas Connections
Installation Guidelines for 60 Hz Air-Cooled Generators 27
LP Gas (Vapor) Installation (Typical)
Figure 5-7. LP Gas (Vapor) Installation (typical)
008966
D
E
J
L
H
G
C
K
B
F
A
LPG BTU/h = ft
3
/h X 2500                                          Megajoules/h = m
3
/h X 93.15
A Fuel data decal
B Minimum distance from rear obstruction—see Distance Requirements
C Manual fuel shutoff valve (pressure port optional)
Must be located no more than 6 ft (1.83 m) away from fuel inlet.
D Pipe fittings (field supplied)
E Flexible fuel line
F Verify minimum distance requirements for regulator vent according to local gas codes. 
Regulator should be a minimum of 5 ft (1.5 m) from generator. Local codes and regulator 
manufacturer may have further clearance requirements.
G Clamp
H Secondary fuel pressure regulator
J Manual shutoff valve
K Primary fuel pressure regulator
L Fuel tank—sized large enough to provide required MJ/BTU for generator operating at FULL 
load and ALL connected appliance loads. Be sure to correct for weather evaporation.










