5.
Remove the lower left screw that secures the
divider plate in the transfer switch (B in
Figure 3-4
).
6. Install the new automatic back plate in the transfer
switch and secure to the transfer switch enclosure
(C in Figure 3-4).
Figure 3-3.
Figure 3-4.
7. Remove the neutral conductor from the main lug
on the neutral bar.
8. Terminate the normal power neutral to the main lug
on the neutral bar (D in Figure 3-5).
9. Terminate the neutral conductor from the generator
power feeder onto the neutral terminal bar in the
transfer switch (E in Figure 3-5).
10.
Terminate the normal power feeder conductors to N1
and N2 on the transfer mechanism (F in
Figure 3-5
).
11.
Terminate the panelboard feeder conductors to T1
and T2 on the transfer mechanism (G in
Figure 3-5
).
12.
Terminate the generator feeder conductors to E1
and E2 on the transfer mechanism (H in
Figure 3-5
).
13. Terminate generator control wiring to the N1, N2,
T1, 23 and 194 terminals in the transfer switch (J in
Figure 3-5).
14. Install the new panelboard cover and properly label
all branch circuits.
15. See Section 4 Checking Automatic Operation
(Automatic HSB Generator Only) to verify proper
transfer switch and generator operation.