Product Manual
Table Of Contents
- Section 1: Safety Rules & General Information
- Section 2: General Information
- Section 3: Activation and Startup
- Section 4: Operation
- Section 5: Maintenance
- Component Locations
- Access Panels
- Maintenance
- Remove From Service
- 25 Hour Break-In
- Daily Maintenance
- Schedule A Maintenance
- Schedule A Maintenance Item Locations
- Preliminary Instructions
- Inspecting the Enclosure Louvers
- Inspecting the Fuel Lines
- Inspecting Coolant Level and Hoses
- Inspecting Radiator for Clogging
- Checking Lubricating Oil Level and Drain Hose
- Replacing Lubricating Oil and Oil Filter
- Checking Battery Condition/Fluid Level
- Inspecting Accessory/Drive Belt
- Replacing Air Filter Element
- Final Instructions
- Schedule B Maintenance
- Schedule C Maintenance
- Return To Service
- Section 6: Troubleshooting
Maintenance
34 Owner’s Manual for Spark-Ignited Stationary Generators
Schedule C Maintenance
NOTE: Perform Schedule C maintenance after 1,000
hours of service. Before proceeding below, first perform
all tasks listed under Schedule A Maintenance and
Schedule B Maintenance.
IMPORTANT NOTE: The following procedures
require special tools and skills. Contact an IASD to
perform these tasks.
1. Remove negative battery cable (black) from nega-
tive battery (-) terminal.
2. Proceed as follows:
• Tighten critical fasteners.
• Replace upper and lower radiator hoses.
• Replace engine coolant bypass hoses.
• Replace block heater hoses.
NOTE: Reset A-B-C/Year time maintenance schedule
counter using Dealer Sub Menu (password required).
3. Install negative battery cable (black) onto negative
battery (-) terminal.
4. Install front access panel. Install left and right side
access panels. See Access Panels.
5. See Return To Service.
Return To Service
Proceed as follows to return the unit to service after
inspection, maintenance, or service of the generator:
1. See Figure 5-5. Pull up rubber flap (C) covering
fuse holder and install 7.5 amp fuse.
2. Install T1 fuse in transfer switch.
3. Verify both auxiliary shutdown switches are ON (I).
See Figure 3-6 for locations.
4. Press AUTO on control panel. A green LED illumi-
nates to verify system is in AUTO.
5. Set generator MLCB (generator disconnect) to ON
(CLOSED).
6. Close viewing window.
7. Remove DO NOT OPERATE tag or placard from
both the control panel and transfer switch.
8. Reset date/time.