Checking Automatic Operation
Proceed as follows to check system for correct automatic
operation:
1. Verify generator is in OFF mode. A red LED on
control panel illuminates to verify system is OFF.
2. Install front cover of transfer switch.
3. Turn on utility power supply to transfer switch,
using the means provided (such as a utility MLCB).
NOTE: Transfer switch will transfer to UTILITY.
4. Set generator MLCB (generator disconnect) to ON
(CLOSED).
5. Press AUTO on control panel. The system is now
ready for automatic operation.
6. Turn off utility power supply to transfer switch.
With generator ready for automatic operation, engine will
crank and start when utility source power is turned off
after a 10 second delay (factory default setting). After
starting, transfer switch connects load circuits to standby
side. Allow system to operate through its entire automatic
sequence of operation.
With generator running and loads powered by generator
AC output, turn on utility power supply to transfer switch.
The system transfers back to utility position and then
runs through cool down cycle and shuts down.
Securing the Generator
Proceed as follows to secure the generator:
1. Use key to install side access panels.
2. Close viewing window.
NOTE: See Figure 3-7. Obtain viewing window hasp, if
not installed. With retaining tab at the bottom, insert
square end of viewing window hasp into slot below view-
ing window. Push on viewing window hasp until it snaps
in place. Gently pull on viewing window hasp to verify it
will not come free.
3. Install customer supplied padlock into viewing win-
dow hasp.
Figure 3-7. Install Viewing Window Hasp
006376