Product Manual
Operation
26 Owner’s Manual for Stationary Generators
Load Transfer
With the generator running, the transfer of load is dependent upon the operating mode as follows:
AUTO
• Starts and runs if utility power fails (falls below 60% of nominal) for five consecutive
seconds (adjustable).
• Starts a five second (adjustable) engine warm-up timer.
• Does not execute transfer if utility power returns before expiration of warm-up timer (but
finishes the warm-up and cool-down cycles).
• Transfers back to utility once utility power returns (above 80% of nominal) for fifteen
consecutive seconds.
• Only shuts down if OFF is pressed or an alarm shutdown occurs.
• Once utility power returns, starts a cool-down cycle before it shuts down.
NOTE: Cool-
down cycle is five minutes if turbocharger equipped, one minute if naturally
aspirated.
EXERCISE
• Only works in AUTO mode.
• Does not exercise if generator is already running in AUTO.
• During exercise cycle, transfers only if utility power fails for ten consecutive seconds.
MANUAL
• Engine cranks and runs even if utility power is present, but does not transfer to generator.
• Transfers to generator if utility fails (falls below 60% of nominal) for ten consecutive
seconds.
• Transfers back to utility when utility returns for fifteen consecutive seconds. The engine
continues to run until the AUTO or OFF key is pressed.
Transfer Switch Manual
Operation
(000132)
DANGER
Electrocution. Do not manually transfer under load.
Disconnect transfer switch from all power sources
prior to manual transfer. Failure to do so will result in
death or serious injury, and equipment damage.
Prior to automatic operation, manually exercise the
transfer switch to verify that there is no binding or
interference with proper operation of the mechanism.
Manual operation of the transfer switch is required if
automatic operation fails.
IMPORTANT NOTE: Always use the applicable
t
ransfer switch owner's manual for actual manual
transfer switch operation instructions. The
information presented here describes a transfer
switch, which is not used for three phase
applications. See specific manual for three phase
transfer switch.
Transfer to Generator Power
When utility power fails, manually transfer to standby
power and start the generator as follows:
1. Press
OFF on the control panel. A red LED illumi-
nates to confirm that the system is in the OFF
mo
de.
2. M
ove the Main Circuit Breaker switch down to the
OFF (Open) position.
3. T
urn off the utility power supply to the transfer
switch using the means provided (such as a utility
main line circuit breaker).
4. Us
e the manual transfer handle (A) inside the
transfer switch to move the main contacts to the
STANDBY position (loads connected to the
standby power source) (C).
5. Pr
ess MANUAL on the control panel. The engine
cranks and starts.
6. Allow
the engine to run for two minutes to bring it
up to normal operating temperature.
7. Mo
ve the Main Circuit Breaker switch up to the ON
(Closed) position.