Install Manual
Table Of Contents
- Installation Guidelines 60 Hz Air-Cooled Generators
- Table of Contents
 - Section 1: Safety Rules & General Information
 - Section 2: Unpacking and Inspection
 - Section 3: Site Selection and Preparation
 - Section 4: Generator Placement
 - Section 5: Fuel Conversion / Gas Connections
 - Section 6: Electrical Connections
 - Section 7: Control Panel Startup / Testing
 - Section 8: Troubleshooting
 - Section 9: Quick Reference Guide
 - Section 10: Accessories
 - Section 11: Diagrams
 
 
Fuel Conversion / Gas Connections
26 Installation Guidelines for 60 Hz Air-Cooled Generators
Natural Gas Installation (Typical)
Figure 5-6. Natural Gas Installation (typical)
008965
A
D
E
C
G
H
J
B
F
I
NG BTU/h = ft
3
/h X 1000 Megajoules/h = m
3
/h X 37.26
A Fuel data decal
B Minimum distance from rear obstruction—see Distance Requirements
C Manual fuel shutoff valve (pressure port optional)
Must be located no more than 6 ft (1.83 m) away from fuel inlet
D Pipe fittings (field supplied)
E Flexible fuel line
F Verify clearance with gas provider. Regulator should be a minimum of 5 ft (1.5 m) 
from generator. Local codes and regulator manufacturer may have further clearance 
requirements.
G Size gas meter for generator operating at FULL load plus all appliance loads
H For underground installations, verify piping system for code compliance
I Reinforcing rod with clamps
J To gas main