Install Manual

Diagrams
Installation Guidelines For 60 Hz Air-Cooled Generators 43
Section 11: Diagrams
IInstallation Drawing (10000002487—1 of 2)
521
[20.5]
196.6
[7.74]
635
[25.0]
732.5
[28.8]
648
[25.5]
218
[8.6]
345.3
[13.6]
679.5
[26.8]
768.3
[30.2]
266.7
[10.5]
355.8
[14.0]
849.3
[33.4]
68.0
[2.7]
392.7
[15.5]
LEFT SIDE VIEW
REAR VIEW
BOLTS RECOMMENDED
3/8 DIA. MASONARY ANCHOR
HOLE (3) PLACES,
16.0 [5/8] DIA.CLEARANCE
A CONCRETE PAD
OPTIONAL MOUNTING TO
HOLE LCOATIONS FOR
FRONT OF UNIT
MOUNTING TO CONCRETE PAD
FUEL INLET : 1/2" NPT (9-16kW)(8-13kVa)
: 3/4" NPT (20-22kW)
REQUIRED FUEL PRESSURE : NATURAL GAS : 3.5-7" WATER COLUMN
LIQUID PROPANE (VAPOR) : 10-12" WATER COLUMN
MAIN AC/CONTROL WIRING HOLE FOR 3/4" CONDUIT
MAIN AC/CONTROL WIRING HOLE FOR 1 1/4" CONDUIT
TRANSFER SWITCH
(IF SUPPLIED)
10000002487a