Install Manual

Control Panel Start-Up/Testing
Installation Guidelines For 60 Hz Air-Cooled Generators 33
Figure 7-2. Installation Wizard Menu Map
Check Manual Transfer Switch
Operation
Refer to the Manual Transfer Operation section of the
owner’s manual for procedures.
UP ARROW =
+
DOWN ARROW =
-
SYSTEM
BAT-
DATE/TIME
SUB MENUS
Language
+ English -
+ Espanol -
+ Francais -
+ Portuguese -
Install Wizard
Set Exercise
Install Wizard
Power Up Unit
Select Hour (0-23)
- 14 +
Select Min (0-59)
- 0 +
ENTERENTER
ENTER
ENTER ENTER
ENTER
Select Hour (0-23)
- 14 +
Select Min (0-59)
- 0 +
ENTER
ENTER
Select Month (1-12)
- 2 +
ENTER
Select Date (1-31)
- 13 +
ENTER
Select Year (0-99)
- 13 +
ENTER
FIRMWARE V 1.01
HARDWARE V 1.05
* Holding the Up or Down arrow
button for 2 seconds will speed dial
through the selections
Defaults to English if
not selected.
Note: If language was
previously programmed
this goes directly
to “Select Hour”
Use UP and DOWN
arrows to select fuel
type then press
“ENTER”
** * * *
*
*
Switched to “OFF”
Hours of Protection
0 (H)
Select Day
- Wednesday +
Fuel Selection
+ NG or LP -
Select Quiet
Test Mode
Yes / No
If Frequency is
Monthly, Select Day
1–28
Cold Smart Start?
YES or NO
ENTER
ESC
Cold Smart Start?
- YES or NO +
002195
ENTER
*
(000132)
DANGER
Electrocution. Do not manually transfer under load.
Disconnect transfer switch from all power sources
prior to manual transfer. Failure to do so will result
in death or serious injury, and equipment damage.