Install Manual
Fuel Conversion / Gas Connections
Installation Guidelines For 60 Hz Air-Cooled Generators 23
LP Vapor Installation (typical)
Figure 5-6. LP Vapor Installation (typical)
001809
NG BTU = ft
3
/h X 1000
Megajoules = m
3
/h X 37.26
A BTU and pressure decal
B Minimum distance from rear obstruction—see Site Selection
C Manual shutoff valve (pressure port optional)
D Pipe nipple (field supplied)
E Flexible fuel line
F Check distance with gas provider
G Reinforcing rod
H Clamp
J Secondary fuel pressure regulator
K Manual shutoff valve
L Primary fuel pressure regulator
M Fuel tank—sized large enough to provide required BTUs for generator and
ALL connected appliance loads. Be sure to correct for weather evaporation.
B
G
M
L
K
J
A
F
E
C
D
H










