Install Manual

Control Panel
Installation Guidelines for Air-Cooled Generators 35
7.3 — Before Initial Start-Up
NOTE: These units have been run and tested at the factory prior to being shipped and do not require any type
of break-in.
Never operate the engine with the oil level below the “Add” mark on the dipstick.
Doing this could damage the engine.
NOTE: This unit comes filled with 30 weight organic oil from the factory. Check the oil level and add the appro-
priate viscosity and amount if necessary.
7.3.1— Installation Wizard
Once activation is complete, the Installation Wizard immediately follows. It allows the user to input generator settings
upon power-up. Figure 7-5.
The Installation Wizard will start every time power (both AC and DC) are removed and re-applied to the generator.