Install Manual
Table Of Contents
- Installation Guidelines
- FREQUENTLY ASKED QUESTIONS
 - Table of Contents
 - Section 1 Safety and General Information
 - Section 2 Unpacking and Inspection
 - Section 3 Site Selection and Preparation
 - Section 4 Generator Placement
 - Section 5 Fuel Conversion/Gas Connections
 - Section 6 Electrical Connections
 - Section 7 Control Panel
 - Section 8 Troubleshooting
 - Section 9 Quick Reference Guide
 - Section 10 Accessories
 - Section 11 Diagrams
 - Part No. 0K5804
 
 
Unpacking and Inspection
10 Installation Guidelines for Air-Cooled Generators
Figure 2-5. Customer Connection Area/Loose Parts Location
9. Figure 2-5 illustrates the following:
• Customer connection area (underneath and behind the control panel)
• Fuel regulator
• Battery compartment
• Location of “Loose Shipped Parts”
Figure 2-6. Generator Back View
Connection Area (Under Control Panel)
Battery Compartment
Fuel
Loose Parts
Regulator
Fuel Connection Hole
20-22 kW MAIN AC/Control Wiring 8-16 kW Main AC/Control Wiring 
Base Fascia (If Equipped)
Conduit Hole (3/4 inch) with Cap PlugConduit Hole(1/2 inch) with Cap Plug










