Install Manual
Table Of Contents
- Installation Guidelines
- FREQUENTLY ASKED QUESTIONS
 - Table of Contents
 - Section 1 Safety and General Information
 - Section 2 Unpacking and Inspection
 - Section 3 Site Selection and Preparation
 - Section 4 Generator Placement
 - Section 5 Fuel Conversion/Gas Connections
 - Section 6 Electrical Connections
 - Section 7 Control Panel
 - Section 8 Troubleshooting
 - Section 9 Quick Reference Guide
 - Section 10 Accessories
 - Section 11 Diagrams
 - Part No. 0K5804
 
 
Unpacking and Inspection
Installation Guidelines for Air-Cooled Generators 9
Figure 2-3. Circuit Breaker Box and Keys (As Shipped)
5. There are two locks securing the lid, one on each side. To properly open the lid, press down, on the lid, above the 
side lock and unlock the latch.
6. Repeat for the other side. If pressure is not applied from the top, the lid may appear stuck. 
NOTE: Always verify that the side locks are unlocked before attempting to lift the lid.
7. Once the lid is open, remove the front access panel by lifting it up and out. Also remove the black panel, indi-
cated by the arrow, over top of the customer connection area.
8. Perform a visual inspection for any hidden freight damage. If damage is present, contact the freight carrier.
Figure 2-4. Inspect for Damage