Install Manual
Table Of Contents
- Installation Guidelines
- FREQUENTLY ASKED QUESTIONS
- Table of Contents
- Section 1 Safety and General Information
- Section 2 Unpacking and Inspection
- Section 3 Site Selection and Preparation
- Section 4 Generator Placement
- Section 5 Fuel Conversion/Gas Connections
- Section 6 Electrical Connections
- Section 7 Control Panel
- Section 8 Troubleshooting
- Section 9 Quick Reference Guide
- Section 10 Accessories
- Section 11 Diagrams
- Part No. 0K5804
Fuel Conversion/Gas Connections
26 Installation Guidelines for Air-Cooled Generators
NOTE: When sizing a secondary regulator for LP or high pressure natural gas applications be sure to note the
maximum individual load capabilities which will be lower than total capacity. This could impact generator start-
ing performance if sized too small.
NOTE: It is not recommended to reduce the fuel pipe size exiting the secondary regulator unless necessary to
accommodate the ½” or ¾” flexible fuel line that is shipped with the generator. This may potentially cause
starting or performance issues.










