LTE CPE Quick installation Guide
WLTMS-110 Connection Guide
Copyright This DOCUMENT is copyrighted with all rights reserved. No part of this publication may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language in any form by any means without the written permission of Gemtek Technology Co. Ltd. Notice Gemtek reserves the right to change specifications without prior notice. While the information in this document has been compiled with great care, it may not be deemed an assurance of product characteristics.
Connectors 1. One RJ-45 connector for connecting to the PoE adaptor. 2. LED indicator inside and SIM card slot for inserting SIM card. 3. A grounding screw on the rear panel.
LED Indicators _ODU LED name LED List MAIN power Ethernet status SIM status Location Color LTE 2 LTE 3 Status Indication ●●● ●●● ●○○ ○○○ ○●○ ○○○ ○○● ○○○ Blue ○○○ ●○○ ○○○ ●●○ ○○○ ●●● ON Power On OFF Power Off Yellow Steady ON Green LTE Status LED : Link Status LTE 1 LED Behavior Red Ethernet Connected Blinking Data Transmission OFF No Ethernet action Steady ON SIM Detected Blinking when On-hook PUK / PIN Code OFF No SIM Detected When CPE is power on, each LED indicates each li
Installing LTE outdoor CPE ● Selecting a Location: LTE Outdoor CPE should be pole-mounted outdoors and aligned so its antenna faces the nearest LTE eNB. When selecting a suitable location for the unit, consider these guidelines: • Place LTE Outdoor CPE as high as possible to achieve the best possible link quality. • Place the LTE Outdoor CPE away from power and telephone lines. • Avoid placing LTE Outdoor CPE too close to any metallic reflective surfaces.
Connecting the Cables ● Outdoor Connection: Connect a grounding cable between the Ground terminal of the LTE outdoor CPE and a good ground connection. ● Preparing and connecting the cable: Use only UTP-FTP 4x2x24AWG CAT. 5E outdoor cable from an approved manufacturer. The cable provides pin-to-pin connection on both ends. 1. Prepare the cable: Use a crimp too for RJ-45 connectors to prepare the wires. Insert them into the appropriate pins and use the tool to crimp the connector.
2. Connect the cable • Remove the sealing cable gland plug from the gland nut. • Open the sealing gland nut and remove it. Don not disassembles the gland base from the bracket. • Insert the cable into the sealing gland base and connect it to the RJ-45 connector at the bottom of the CPE. Make sure the connector is completely inserted and tightened. • Insert the rubber bushing on the cable into the gland base. • Tighten the gland nut. Use the dedicated tool for fastening the sealing glands. 3.
air bubbles. • Slide the cold shrink sleeve on top of the connector. Make sure that the sleeve covers both cable connector and unit connector. • Pull the cord slowly to shrink the sleeve. ● Indoor Connection 1. It is assumed that the RJ-45 is already connected to the LTE outdoor CPE. Assemble an RJ-45 connector with a protective cover on the other end of the LTE outdoor CPE cable. 2. Connect the other end of the cable from ODU to the PoE adaptor which labeled “POE”. 3.
Web Interface Please follow the steps below to configure your device through the web interface: Step1: Open the Web browser (Internet Explorer) and enter the default IP address of the ODU CPE, which is : http://192.168.15.1 Web browser Step2: Enter ODU administrator login username/password to access the web management interface. The default username/password is administrator/administrator.
Web management interface Step3: The page shown here gets displayed in your browser after login; you can now configure the device settings.
Europe – EU Declaration of Conformity This device complies with the essential requirements of the R&TTE Directive 1999/5/EC. The following test methods have been applied in order to prove presumption of conformity with the essential requirements of the R&TTE Directive 1999/5/EC: EN 301 908-1 V7.1.1 EN 301 908-13 V6.2.1 EN 62311:2008 EN 301 489-1 V1.9.2 EN 301 489-24 V1.5.
[German] Ü bereinstimmung mit den grundlegenden Anforderungen und den übrigen einschlägigen Bestimmungen der Richtlinie 1999/5/EG befindet. Eesti [Estonian] Käesolevaga kinnitab [tootja nimi = name of manufacturer] seadme [seadme tüüp = type of equipment] vastavust direktiivi 1999/5/EÜ põhinõuetele ja nimetatud direktiivist tulenevatele teistele asjakohastele sätetele.
1999/5/EC. Magyar [Hungarian] Polski [Polish] Alulírott, [gyártó neve] nyilatkozom, hogy a [... típus] megfelel a vonatkozó alapvetõ követelményeknek és az 1999/5/EC irányelv egyéb elõírásainak. Niniejszym [nazwa producenta] oświadcza, że [nazwa wyrobu] jest zgodny z zasadniczymi wymogami oraz pozostałymi stosownymi postanowieniami Dyrektywy 1999/5/EC.
Federal Communication Commission Interference Statement This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules.