Quick Installation Guide
Table Of Contents
- Introduction
- Professional Installation Instructions
- Instructions d'installation professionnelle
- Overview
- Package Content
- Additional Installation Requirements
- Installing the ODU
- Selecting a Location
- Mounting the ODU
- Installing The IDU
- Connecting the Cables
- Outdoor Connections
- Checking for Proper Operation
- Commissioning
- Federal Communication Commission Interference Statement
- FCC Radiation Exposure Statement
- Europe - EU Declaration of Conformity
- Industry Canada statement
PRO 6000 CPE Quick Installation Guide
P/N 216000 -2- May 2012
Overview
The PRO 6000 CPE is a WiMAX subscriber station designed to provide Internet access for a home or small office. The PRO CPE
includes an outdoor unit (ODU) connected to an indoor unit (IDU). The ODU provides the WiMAX Internet link, and the IDU
serves as the gateway for a local Ethernet wired and phone.
The indoor unit includes:
• One standard RJ-45 Ethernet port for LAN connections,
• One 8 PIN RJ-45 Ethernet port for connection to the ODU. This cable provides a dedicated Power-over-Ethernet (PoE) power
supply to the ODU, as well as a data link between the ODU and the IDU. The IDU should be connected to an AC power
connection.
• One RJ-11 port for telephone (VoIP) connection
The PRO CPE provides a web-based management interface for the configuration of all features
.
Package Content
Please make sure that each package contains the items listed below:
• Outdoor WiMAX unit (ODU)
• Indoor Power Supply unit (IDU) with adaptor plug
• Crossed Ethernet cable with two RJ-45 connectors for connecting the IDU to a PC/HUB/switch.
• Pole mounting kit
• Optional - Tilt Accessory kit (ordered separately)
• This Quick Installation Guide
Additional Installation Requirements
• Indoor-to-outdoor Category 5E PoE 4x2x24# FTP Ethernet cable with two shielded RJ-45 connectors* and an RJ-45
connectors crimping tool.
• Grounding cable with an appropriate termination.
• Sealing materials: mastic tape (Scotchfil™ Electrical Insulation Putty), Cold Shrink sealing kit.
• Installation tools and materials
• Sealing gland fastening tool*
Installing the ODU
Before installing the CPE, verify that you have all the items listed in the package checklist. If any of the items are missing or
damaged, contact your WiMAX service provider.
Selecting a Location
The ODU should be pole-mounted outdoors and aligned so its antenna faces the nearest WiMAX base station. When selecting a
suitable location for the unit, consider these guidelines:
• Place the ODU as high as possible to achieve the best possible link quality.
• Place the ODU away from power and telephone lines.
• Avoid placing the ODU too close to any metallic reflective surfaces.
• Be sure to ground the ODU with an appropriate grounding wire (not included) by attaching it to the grounding screw on the
unit and to a good ground connection.
Figure 1: ODU and IDU
INFORMATION
Items marked with an asterisk (*) are available from the manufacturer.
IDU
ODU