Installation Guide

4
© 06-2017
968.074.00.0 (00)
Tank and carrier installation
1 Locate carrier supporting studs and
reinforce with additional nails. Ensure
rough-in for the carrier is plumb and square
.
Wall framework must be affixed to the floor
and ceiling for maximum support.
2 Position carrier unit in the prepared opening.
Carrier face plate must be flush with the
front of the surrounding studs so that
maximum support for the wall sheeting
(applied later) will be accomplished. With
carrier still in place, mark all anchor and bolt
hole locations on sole plate and studs. Mark
location for the 3" DWV discharge pipe.
3 Pull out carrier from framework and drill six
(6) pilot holes (3/16") for the supplied lag
screws where marked on sole plate. Also
drill six (6) bolt holes (5/16") where marked
on both studs. Use hole saw and bore a 4"
hole through sole plate and floor for the
discharge stop out pipe.
4 Install 3" DWV waste pipe through floor and
connect to waste line (i.e. PVC, copper, cast
iron).
5 Set carrier unit sideways back into
framework and bolt in place with hardware
provided.
6 Complete waste elbow connection with 3"
DWV shielded coupling (D - provided) to
waste pipe.
7 Install two (2) 1/2" x 6" fixture support rods
with plastic sleeves (A), yellow pipe caps (B)
and mud guard (C) for protection during wall
surface construction.
0
°
4
5
°
0
°
4
5
°
For finishing the installation of bowl and actuator
plate see detailed instructions.
12"–16"
F.F.
47"–51"
A
Install ½" rods with plastic sleeves,
B
pipe plugs and
C
mud guard during the rough-in installation
D
Complete waste elbow connection with 3" DWV
shielded coupling (D - provided) to waste pipe.
19 ¾"
⁵⁄₁₆"
⁵⁄₁₆"
C
A
B
D