Instruction Manual

12
D
GB
F
E
96246-07.2014-DGbRu
4| Compressor assembly
4.6 Operating the shut-off valves
4.5 Laying suction and discharge lines
Aruleofthumb:Alwayslaytherstpipesectionstartingfromtheshut-offvalvedownwards
and parallel to the drive shaft.
Fig. 15
Rigid
Fixed point
As short as possible
ATTENTION Improperlyinstalledpipescancausecracksandtears,theresult
being a loss of refrigerant.
INFO Proper layout of the suction and discharge lines directly after
the compressor is integral to the system’s smooth running and
vibration behaviour.
Before opening or closing the shut-off valve, release the valve spindle seal by approx. ¼ of a turn
counter-clockwise.
After activating the shut-off valve, re-tighten the adjustable valve spindle seal clockwise.
Fig. 16
Fig. 17
Valve spindle seal
loosen
tighten