Installation guide

Installation Preparation
INSTALLATION OPTIONS
Installation Below
a Single Oven
Installation Below
a Double Oven
23-1/2"
Hin. lnside t
2×2 or 2×4 Anti-Tip
Block Against Rear
Wall, 9" From Floor
to Bottom of Block
jo-
2" IVlin.
2x2 or 2×4 Anti-Tip
Block Against Rear
Wall, 9" From Floor
to Bottom of Block
Allow 5/8"
Overlap on
/ All Sides
2" IV]in.
1" Min. Above Toekick or Adjust
to Oven Installation Height
NOTE:Additional clearance between cutouts may
be required. Checkto be sure that oven supports
above the Warming Drawer location does not obstruct
the required interior 23-1/2" depth and 9-1/4" height.
B
i" Min. Above Toekick
Dimensions
A B
ZTD910 28-1/2" 30"
ZKD910 25-1/2" 26-3/4"
NOTE:Additional clearance between cutouts may
be required. Checkto be sure that oven supports
above the Warming Drawer location does not obstruct
the required interior 23-1/2" depth and 9-1/4" height.
When installed under a wall oven:
Warming drawers are approved for installation below only
certain specified wall oven models. Seethe label attached to
the top of the warming drawer for approved models.
When installed, the front face of the drawer will be nearly
flush with adjacent cabinetry doors.
Drawer overlaps will conceal cut edges on all sides of the
opening.
The rough opening for the drawer must be:
- Depth: 23-1/2" min. from inside back to front of cabinet
frame.
- Width: 25-1/2" for 27" wide models, 28-1/2" for 30" wide
models.
- Height: 9-1/4".
- Allow 2" min. between oven and drawer cutouts for
clearance of overlaps.
NOTE: If you are installing in frameless cabinets, it may
be necessary to install :]./2"wide cleats to accept drawer
mounting screws. See drawer for mounting screw locations.