Technical Specifications

Document Changes
Version/ Date Changes
C/02-2011
Added to section on DO switches configuration.
Updated Registration section updated to GE logo software
D/3-2013
Removed references to double-acting
Fixed issues from S. Leledy.
E/9-2013
Changed the Simplified Switch diagram in Configure I/O section.
Added Cautions about Position Low and Upper Limits.
Added text about the 4-20 retransmit galvanic isolation.
F/02-2014
Updated the Simplified Switch diagram in Configure I/O section
and updated the text.
G/8-2014
Updated Configure tab to add Air Loss Trip and Trip Level fields.
Update software install section to reflect 1.10.0 version.