Technical Specifications
© 2014 General Electric Company. All rights reserved.
232 | =GE Oil & Gas
PST Setup Guidelines
This section outlines a general set of guidelines you can use to configure PST. These are:
“1. Set PST Start Trigger” on page 233
“2. Run Extended Signature” on page 234
“3. Determine Friction, Breakout, PST Minimum Pressure From Extended Signature” on
page 235
“4. Set PST Parameters” on page 237
Figure 243 shows the parameters used o configure a PST.
Figure 243 PST Test Settings Graph
where:
1 = PST trigger (HART, Analog, local
Scheduler)
2- PST Minimum Pressure
3- PST Speed 4- Dwell Time
5- PST Time 6- PST Travel