Owners Guide
16 49-2000707 Rev. 3
Installation Preparation
NEW CONSTRUCTION, PRE-PLANNING, OR REMODELING
NOTE: For existing instruction, skip to the next section.
FOR TOP VENTING
■For ducted installation through the top, the 8”
diameter hole (for 30” or 36” model) or the 10”
diameter hole (for 48” model) for the duct in the
ceiling must be center 6-1/4” away from the finished
rear wall in the installation space.
FOR BACK VENTING
■Forductedinstallationthroughtheback,the10-1/2"
x 13-1/4” cut out for the duct in the wall must be
centered in the installaton space, left to right and
located 3-3/4” above intended install height from
bottom of the hood.
6-1/4”
3-3/4”
10-1/2" x 13-1/4”
Bottom of Hood
■Thehoodjunctionboxknockoutislocated10-1/2”tothe
left from center of the hood. Ensure enough wire length is
available to make electrical connection.
INSTALLATION INSTRUCTIONS