Brochure

GE © 2010. All rights reserved.
10/13, PC #12-0300
geoilandgas.com/pressurecontrol
Multi-Bowl Wellhead System
295-5649
Multi-Bowl Experience —
North Morecambe Bay
First multi-bowl system with NT-2 connections and
MS-1 seal technology
South Texas tubingless multi-bowl system
10,000 psi, 350ºF system
Speed drilling competition
Saved 5% of total well cost
World record water depth
Platform multi-bowl system
Industry’s rst true 18-3⁄4” 10M single-stack multi-bowl
system
First 18-3⁄4” surface MS700 application system
First 21-1⁄4” surface MS700 system
MB233 with ESP