Installation guide

Installation Preparation
PreparationWITHOUTanAccessoryStorage
Drawer
PREPARE THE OPENING (CONT.)
Installation over a GE/Monogram Oven:
30" 23-1/2" Construct Solid
Bottom Min.
3/8" Plywood
Supported by
2x4 or 2x2
Runners all
/ Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
If you are replacing u GE/tVlonogrum electric
double oven with the combined installation of
on Advontium 240V and u single oven, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2" minimum shown.
PREPARE THE OPENING (CONT.)
Installation over a GE/Monogram Oven and
Warming Drawer:
30" -- 23-1/2"
Construct
Solid Bottom
Hin. 3/8"
Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
Min.
(3" recommended)
Per Oven
Requirement
2" Hin.
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Worming Drawer location do
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.
A CAUTION: Forpersonal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of this approximate 80-pound oven, plus additional
oven loads of up to 50 pounds or o total weight
of 130 pounds.
APRECAUCI6N: Poroseguridod
personal, Io superficie de montoje debe poder
soportor Io cargo del gabinete, ademc_s del peso
aproximodo de 80 libros del homo, mc_s los
cargos odicionales del homo de hasto 50 libros
o un peso total de hosta 130 libros.