Installation guide

Installation Preparation
PREPARE THE OPENING CCONT.I
Installation over a GE Oven:
17-1/2"
Construct Solid
Bottom Hin.
3/8" Plywood
Supported by
2x4orlx2
Runners oll
Four Sides
2" Min.
Per Oven
Requirement
*If you ore replacing u GE electric double oven
with the combined instollotion of on Advontium
120 undo single oven, use the dimensions shown.
The middle toil seporuting the two openings muy
need to be lurger thun the 2" minimum shown.
PREPARE THE OPENING ICONT.}
Installation over a GE Oven and Warming
Drawer:
Construct
27"-- 23-1/2" Solid Bottom
Hin. 3/8"
Plywood
Supported by
2x4orlx2
Runners all
Four Sides
45-1/4"
- 2" Min.
Per Oven
Requirement
2" Min.
NOTE: Additionul cleurunces between the cutouts
muy be required. Check to be sure the oven
supports obove the Worming Drower locution do
not obstruct the required interior depth ond height.
See Worming Drawer installation instructions for
detuils.
CAUTION: Forpersonul sofety, the
mounting surfuce must be cupoble of supporting
the cabinet loud, in uddition to the udded weight
of the 75-pound product, plus udditionul oven
Ioods of up to 50 pounds or o totol weight of 125
pounds.
REMOVE THE PACKAGING
Lift the oven out of the corton.
Remove oil pocking moteriol und tope.
Open the door und remove ports box.
Locote ports pockoge contuining mounting screws.
7