Installation guide

Installation Preparation
PreparationWITHOUTan AccessorgStorageDrawer
PREPARE THE OPENING (CONT,)
Installation over a GE/Monogram Oven:
17-1/2"
25-1/4"
Construct Solid
Bottom Min.
3/8" Plywood
Supported by
2x4 or 2x2
Runnersall
Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
If Uou are replacing a GE/Honogram electric
double oven with the combined installation of
an Advantium 2/40V and a single oven, use the
dimensions shown. The middle rail separating
the two openings mau need to be larger than
the 2" minimum shown.
PREPARE THE OPENING {CONT.)
Installation over a GE/Nonogram Oven and
Warming Drawer:
ConstructSolid
30" 23-1/2" Bottom Min.
3/8" Plywood
Supportedby
2x4 or 2x2
Runnersall
FourSides
A
17-1/2" 2" Min.
B"recommended)
Per Oven
Requirement
45-1/4" 2" Min.
Min.
_equirement
NOTE: Additional clearances between the cutouts
ma U be required. Check to be sure the oven
supports above the Warming Drawer location do
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.
CAUTION: For personal safet U, the mounting
surface must be capable of supporting the
cabinet load, in addition to the added weight of
this approximate 80-pound oven, plus additional
oven loads of up to 50 pounds or a total weight
of 130 pounds.
6