Installation guide

ASSEMBLYTO ADVANTIUM 240V BUILT-IN SPEEDCOOK OVEN
[] REMOVE PACKAGING AND PARTS
Remove the drawer from the carton.
Remove all packing material and tape.
Open the drawer and remove ang parts inside.
Locate parts.
A_sembly
Instructions
Side Supports {2)
Assemblg
Instructions
Screws (2 Sets)
[] ASSEMBLING THE OVEN TO DRAWER
[] Place storage drawer on a surface with the
front of drawer hanging over the edge of the
surface. Not placing the front edge of drawer
over the edge of the surface mag result in
damage to the drawer since the front edge of
drawer hangs below the bottom of drawer.
[] Place the oven on top of the storage drawer.
lake sure that the back and sides of the oven
align with the back and sides of drawer.
NOTE: The bottom of the oven side flanges will
sit directlg in front of the top of the storage
drawer side flanges.
ASSEMBLING THE OVEN TO DRAWER
(CONT.)
[] Remove the front two bottom screws on each
side of the oven and the top center screw on
each side of the storage drawer.
II
J
|
J
[] Place the side supports into the tabs on the
drawer and secure using the screws supplied
and the screws removed in Step C.
|
J
[] The oven and storage drawer assemblg is now
readg to be installed. Return to the Advantium
2/40V Built-In SpeedCook Oven Installation
Instructions to complete the installation.
13