Installation Instructions Advantium ®240V Built-ln SpeedCook Ovens PSB2200 PSB2201 ZSC2200 ZSC2201 ZSC2202 49-40574-1 MFL06213302 02-08 JR
Safetg Information BEFORE YOU BEGIN Read these instructions completely CONTENTS and carefully. Design Information Models Available ...................................................................... 2 Product Dimensions and Clearances ............................ 3 Tools and Parts Required .................................................... 3 Parts Supplied .......................................................................... 3 Electrical Tools and Parts Required ................................
Design Information PRODUCT DIMENSIONS AND CLEARANCES NOTE: Appearance will vary by model. _21-1/2"_ 29-3/4" [ "1 O 11 \ \ \ J \ Yy 19" ,, TOOLS AND PARTS ADVANCEPLANNING REQUIRED (NOT SUPPLIED} • These ovens may be installed directly into a 30" wide oven cabinet. [] #2 Phillips screwdriver [] Hand held drill [] [] [] [] • Cutout dimensions are NOT the same for installation with or without an accessory storage drawer. Hake sure to use the correct cutout when preparing the opening.
Installation Preparation ELECTRICALREQUIREMENTS INSTALLJUNCTION BOX Single Speedcook The conduit is located at the top right on the back of the oven. Installation Product rating is 120/208 or 120/240 volt, 60 Hz, 30 amps. This product must be connected to a supply circuit of the proper voltage and frequency and protected by a time delay fuse or circuit breaker. Power should be supplied from a separate, dedicated 30-ampere branch circuit.
Installation Preparation PreparationWITHOUTan AccessorgStorageDrawer PREPARE THE OPENING PREPARE THE OPENING (CONT.) The Advantium Installation over a GE/Monogram Warming Drawer: 240V can be installed in combination with other GE/Monogram appliances. Always follow each product's Installation Instructions to complete the installation. Single Advantium 23-1/2" 24OV Installation: Order a 30" wide single oven cabinet or cut the opening in a wall to the dimensions shown.
Installation Preparation PreparationWITHOUTan AccessorgStorageDrawer PREPARE THE OPENING (CONT,) PREPARE THE OPENING {CONT.) Installation Installation over a GE/Nonogram Warming Drawer: over a GE/Monogram 25-1/4" 17-1/2" Oven: Construct Solid Bottom Min. 3/8" Plywood Supported by 2x4 or 2x2 Runners all Four Sides Oven and ConstructSolid 30" 23-1/2" Bottom Min. 3/8" Plywood Supportedby 2x4 or 2x2 Runnersall FourSides A 2" Min. (3" recommended) 17-1/2" Per Oven Requirement 2" Min.
Installation Preparation Preparation WITHan AccessoryStorage Drawer NOTE:MODELZSC2202CANNOTBE INSTALLEDWITH AN ACCESSORY STORAGEDRAWER.SEEINSTALLATIONPREPARATION WITHOUTAN ACCESSORY STORAGEDRAWERFORTHISHODEL. PREPARE THE OPENING PREPARE THE OPENING The Advantium 240V can be installed in combination with other GE/Nonogram appliances. Always follow each product's Installation Instructions to complete the installation.
Installation Preparation Preparation WITHan AccessoryStorage Drawer NOTE:MODELZSC2202CANNOTBE INSTALLEDWITH AN ACCESSORY STORAGEDRAWER.SEEINSTALLATIONPREPARATION WITHOUTAN ACCESSORY STORAGEDRAWERFORTHISHODEL. PREPARE THE OPENING (CONT.) PREPARE THE OPENING (CONT.) Installation Installation over a GE/Monogram Warming Drawer: 30" over a GE/Nonogram 23-1/2" / Oven: Construct Solid Bottom Min.
Installation [] Instructions REMOVE THE PACKAGING AND PARTS ° Remove all packing material and tape. • Locate parts package containing mounting screws. • Remove the oven from the carton. Do not lift unit bg handle or conduit. Two people are required to lift this oven. • Open the door and remove ang packaging O_ner*g Manual in oven.
Installation [] Instructions ROUTE CONDUIT THROUGH CUTOUT CAUTIO N: Two people [] ROUTE CONDUIT THROUGH CUTOUT (CONT.) When connecting circuit: are required to lift the oven into the opening. Grasp the bottom at front and rear. Discard foam base. DO NOT USE HANDLE OR CONDUIT TO LIFT THE OVEN. DAMAGE WILL OCCUR. to a 3-conductor branch • Connect oven red lead to branch circuit red lead. • Connect oven black lead to branch circuit black lead.
Installation [] Instructions [] INSTALL BOTTOM TRIM INSTALL MOUNTING NOTE: If installing the Advantium 2/40 Oven with an accessoru storage drawer, the bottom trim is not required. Proceed to Step/4. j SCREWS mo ] • Align bottom trim tabs to slots in the bottom of the oven. • Slide the oven the remaining wau into the opening so that the side flanges and control panel are against the cabinet frame. Hake sure that the oven is centered in the opening.
Assembly Instructions Advantium ®240V Built-ln Accessory Storage Drawer J×2200, J×2201, Z×2201 BEFORE YOU BEGIN MODELS AVAILABLE Profile Models: Read these instructions completely and carefully. Read the Installation Instructions for the Advantium 240V oven JX2200BB-Block JX2201SS-Stoinless Steel completely and carefully for cutout dimensions and step-by-step instructions. Monogram Models: IM PORTANT- sove these instructions for ZX2201SS-Stainless Steel local inspector's use.
ASSEMBLYTO ADVANTIUM 240V BUILT-IN SPEEDCOOK OVEN [] ASSEMBLING THE OVEN TO DRAWER (CONT.) REMOVE PACKAGING AND PARTS • Remove the drawer from the carton. [] • Remove all packing material and tape. • Open the drawer and remove ang parts inside. Remove the front two bottom screws on each side of the oven and the top center screw on each side of the storage drawer. • Locate parts.
NOTE: while performing installations described in this book, safety glasses or goggles should be worn NOTE: Product improvement is a continuing endeqvor at General Electric Therefore, materials, appearance and specifications are subject to change without notice Printed in Korea GE Consumer & Industrial Appliances General Electric Company Louisville, KY/40225 ge.