Installation guide
Installation Preparation
PreparationWITHOUTanAccessorgStorageDrawer
PREPARE THE OPENING {cont.)
Installationover a GE/Monogram oven:
17-1/2"
Construct Solid
Bottom Min.
3/8" Plywood
Supported by
x4or2x2
Runnersall
Four Sides
2" Min.
(3" Recommended)
Per Oven
Requirement
• If Uou are replacing a GE/IVlonogram electric
double oven with the combined installation
of an Advantium 12OV and a single oven, use
the dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2" minimum shown.
PREPARE THE OPENING {cont.)
Installation over a GE/Monogram Oven and
Warming Drawer:
23-1/2"
PerWarming
DrawerRequirement
ConstructSolid
Bottom Min.
3/8" Plywood
Supportedby
_2x4or2x2
Runnersall
FourSides
2" Min.
(3" Recommended)
Per Oven
Requirement
Min.
(3" Recommended)
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location
do not obstruct the required interior depth
and height. See Warming Drawer installation
instructions for details.
-&CAUTION: Forpersonal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of this approximate 80-pound oven, plus
additional oven loads of up to 50 pounds
or a total weight of 1:30 pounds.










