Installation guide

Installation Preparation
PREPARE THE OPENING (CONT.)
installationovera GE Oven:
Construct Solid
Bottom Min. 3/8"
Plywood
Supported by
2x4or1 x2
Runnersall Four
Sides
2" Min.
Per Oven
Requirement
*If gou are replacing a GE electric double oven
with the combined installation of an Advantium
120 and a single oven, use the dimensions shown.
The middle rail separating the two openings mag
need to be larger than the 2" minimum shown.
PREPARE THE OPENING (CONT.}
installation over a GE Oven and Warming
Drawer:
ConstructSolid
27"-- 23-1/2" Bottom Min.
3/8" Plywood
Supportedby
2x4orlx2
Runnersall Four
Sides
25-1/8"
MJn.
PerOven
Requirement
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location do
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.
CAUTION: Forpersonal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of the 75-pound product, plus additional oven
loads of up to 50 pounds or a total weight
of 125 pounds.
REMOVE THE PACKAGING
Lift the oven out of the carton.
Remove all packing material and tape.
Open the door and remove parts box.
Locate parts package containing mounting screws.
6