Brochure
Assembly
GE builds true ‘plug & play’ solutions – accelerating production,
minimizing infield construction requirements and ensuring
each unit’s suitability to the project’s final physical site and
ongoing operating requirements. All mechanical, electrical and
instrumentation work is managed by experienced GE personnel.
We can also design and transport module components for
construction localized at the customer’s site, if that is preferred.
Our operations team can still provide all project management,
engineering, quality, EHS and procurement functions. We regularly
provide this experience at integration yards around the world,
partnering with local companies to ensure GE’s high quality
standards are applied to each project.
Environmental Health & Safety
GE has a fully developed EHS program designed to meet the
most stringent regulations of all regions worldwide. Since our
modules are destined for a wide range of sites with equally
varying regulations and environments, all their needs are woven
into our integrated approach to every project. For example, we
developed innovative quarantine procedures to address the highly
sensitive environmental needs of Gorgon’s Barrow Island nature
reserve. This process can now be replicated and adapted to other
environmentally challenging projects in the future.
Dedicated customer support
Each module project is directed by a team of experienced Site
Operation Leaders who support each customer from design
through to commercial operation. This continuity ensures safe and
efficient execution of every project, with smooth transitions and
open communication from beginning to end.
Avenza at a glance
Avenza is strategically located on Italy’s west coast, close
to our Massa plant and even closer to the Marina di Carrara
port. From there, modules are easily readied for international
shipping to the Atlantic through the Strait of Gibraltar, to the
Indian Ocean through the Suez Canal and Red Sea, or eastward
through the various canal systems.
• 140,000 m
2
(36 acres) for construction,
commissioning and testing
• 30,000 m
2
(7 acres) of dedicated storage
• 4,000 tons load-out capacity
Massive manufacturing










