Brochure
2006-
2008
2010
Gorgon
5 x MS9001E GTG
modules fully tested
Kashagan
The highest pressure
compressor ever built
There are three equally important parts to delivering
truly successful modular solutions. First, is the cross-
functional engineering expertise to design them using
the most advanced technologies available. Second,
is the capacity and project management strength to
assemble them. Finally, is the crucial ability to test
them and ensure they will perform as designed.
GE Oil & Gas has been systematically evolving the modular
approach to turbomachinery design since 1985. In that time,
we have supplied over 40 pre-assembled power generation and
compression modules, customized to meet the specific needs of
their increasingly challenging projects around the world.
Between December 2012 and the end of 2013, we will deliver
seven of the industry’s most advanced modules ever, five for
Australia and two for the North Sea. And we have the capacity to
produce more.
We continually invest significant resources in materials,
aerodynamics and every other conceivable area – including
perhaps the most important one of testing and qualification. We
also work closely with key industry-leading clients to ensure that
our direction is always true to their needs and where the industry
overall is moving.
As a result, GE’s latest modular solutions make the difference between
‘gathering acceptable parts’ and ‘creating an exceptional whole’.
A fully engineered
& tested solution










