Instruction Manual
Table Of Contents
- English
- Safety Information
- Design Information
- Installation Preparation
- Installation Instructions
- Step 1, Remove Packaging
- Step 2, Move Range Indoors
- Step 3, Install Anti-Tip Device
- Step 4, Connect Range to Gas
- Step 5, Connect Electrical
- Step 6, Roll Range into Position
- Step 7, Level the Range
- Step 8, Replace Oven Doors
- Step 9, Check Burners
- Finalize Installation
- Installation Checklist
- Accessories
- Accessory Installation
- Gas Conversion
- Français
- Consignes de securité
- Caractéristiques
- Préparation de l’installation
- Consignes d’installation
- Étape 1, Sortez l’appareil de son emballage
- Étape 2, Déplacez la cuisinière à l’intérieur
- Étape 3, Installez le support anti-basculement
- Étape 4, Raccordez la cuisinière à l’alimentation en gaz
- Étape 5, Branchez la cuisinière à la prise électrique
- Étape 6, Placez la cuisinière dans sa position en la faisant rouler
- Étape 7, Ajustez le niveau de la cuisinière
- Étape 8, Réinstallez les portes du four
- Étape 9, Vérifiez les brûleurs
- Terminez l’installation
- Liste de vérification pour l’installation
- Accessoires
- Installation des accessoires
- Conversion de la cuisinière pour le gaz
- Español
- Información de seguridad
- Información de diseño
- Preparación para la instalación
- Instrucciones de instalación
- Paso 1, Quite el empaque
- Paso 2, Traslade la cocina al interior
- Paso 3, Instale el dispositivo anti-volcaduras
- Paso 4, Conecte la cocina al suministro de gas
- Paso 5, Conecte la electricidad
- Paso 6, Coloque la cocina en su posición
- Paso 7, Nivele la cocina
- Paso 8, Reemplace las puertas del horno
- Paso 9, Controle los quemadores
- Finalice la instalación
- Lista de control de la instalación
- Accesorios
- Instalación de accesorios
- Conversión de gas

INSTALL COVER PANELS (cont.)
ALTERNATE METHOD: When side access is blocked
• Install bottom cover over the bottom support while
driving one screw into each side.
• Hold top cover in place while marking screw
locations, just below shelf support and onto bottom
cover.
• Remove the shelf and drill a 9/64" diameter
hole in the pencil-marked locations.
• Mount the top cover over the top support
and secure the front cover with screws through
the drilled holes on each side.
• Install screws through each top corner.
ZXADJB30PSS, ZXADJB36PSS, ZXADJB48PSS Accessory Installation
INSTALL COVER PANELS
See alternate method if side access is blocked.
• Hold the bottom cover over the bottom support
while driving one screw (provided) into each side.
• Place the top cover with shelf over the top wall
support. If you have access to the sides, secure
the panel with two screws on each side.
• Secure the top cover with shelf to the top
support with screws through the front of the panel,
at the top corners. Use one screw on each side.
Shelf
Install
Screw
Cover Panel
Install
Screw
Mark Screw Locations
for Alternate Method
Install Screw in Top Corner on Each Side
Install Screw
on Each Side
Install Corner Screws
20