Installation Guide

WIRING
4
NOTE: Make all electrical connections in accordance
with the National Electrical Code and any applicable
local code requirements.
NOTE: Verify that supply voltage is correct by
comparing it to nameplate.
Terminals are readily accessible on terminal board
and will accept service leads ranging in size from
AWG No. 16 through No. 6.
Service leads (See xture labeling for supply wire
temperature rating) should extend through mounting
bracket approximately 7 inches.
Attach service leads to terminal board as shown on
luminaire nameplate.
See table for screw torques (See Table 1).
A wiring diagram is provided on a label in luminaire.
WARNING
Under no conditions should bolts be torqued to level
greater than 12 ft-lbs. (16.3 N•m)
PHOTOELECTRIC CONTROL
5
(If option present) - Photoelectric control receptacle
should be oriented before control is installed.
Loosen the two holding screws and rotate receptacle
until “North” is directed as near as possible to true
North.
Tighten holding screws and install control.
Lower PE receptacle to rmly seat it in this position.
Then install PE control.
TABLE 1. Terminal Board Torque Table
Wire Range Copper Aluminum Torque (in lbs.)
10 - 16 SOL, STR 30
8 - 6 SOL, STR
STR6 SOL, STR
45
INSTRUCTIONS FOR ROTATING
OPTICS
6
Remove both hinge bolts (See Fig. 1)
Take door out of hinge
Remove Tethers
Do not remove tethers until door is out of hinge!
Remove four retaining bolts on door (See Fig. 2)
Rotate optic 180 degrees
Install four Retaining bolts and tethers
Place door in hinge and bolt to housing
Do not reinstall door without tethers attached rst!
FIGURE 1
FIGURE 2
GE_GEH-6019 _AreaLightingEvolve_LED_EADC_Installation_FINAL_EngFre_062513.indd 3 6/25/2013 12:50:44 PM