Installation Guide
WIRING
4
• NOTE: Make all electrical connections in accordance
with the National Electrical Code and any applicable
local code requirements.
• NOTE: Verify that supply voltage is correct by
comparing it to nameplate.
• Terminals are readily accessible on terminal board
and will accept service leads ranging in size from
AWG No. 16 through No. 6.
• Service leads (See xture labeling for supply wire
temperature rating) should extend through mounting
bracket approximately 7 inches.
• Attach service leads to terminal board as shown on
luminaire nameplate.
• See table for screw torques (See Table 1).
• A wiring diagram is provided on a label in luminaire.
WARNING
Under no conditions should bolts be torqued to level
greater than 12 ft-lbs. (16.3 N•m)
PHOTOELECTRIC CONTROL
5
• (If option present) - Photoelectric control receptacle
should be oriented before control is installed.
• Loosen the two holding screws and rotate receptacle
until “North” is directed as near as possible to true
North.
• Tighten holding screws and install control.
• Lower PE receptacle to rmly seat it in this position.
Then install PE control.
TABLE 1. Terminal Board Torque Table
Wire Range Copper Aluminum Torque (in lbs.)
10 - 16 SOL, STR 30
8 - 6 SOL, STR
STR6 SOL, STR
45
INSTRUCTIONS FOR ROTATING
OPTICS
6
• Remove both hinge bolts (See Fig. 1)
• Take door out of hinge
• Remove Tethers
Do not remove tethers until door is out of hinge!
• Remove four retaining bolts on door (See Fig. 2)
• Rotate optic 180 degrees
• Install four Retaining bolts and tethers
• Place door in hinge and bolt to housing
Do not reinstall door without tethers attached rst!
FIGURE 1
FIGURE 2
GE_GEH-6019 _AreaLightingEvolve_LED_EADC_Installation_FINAL_EngFre_062513.indd 3 6/25/2013 12:50:44 PM