Installation guide
31-2000354 Rev.0 7
Standard Installation Preparation
PREPARE THE OPENING (CONT.)
Installation over another Advantium Built-In 
Oven:
30Ǝ
23-1/2Ǝ
25-1/4Ǝ
17-1/2Ǝ
2 1/2Ǝ Min. 
(3 1/2Ǝ Recommended)
17-1/2Ǝ
Construct  
solid bottom - Min. 
3/8” plywood 
supported  
on all four sides. 
Must be able to 
support weight 
of oven and 
contents.
• If you are mounting a GE Appliances Appliances/
Monogram Built-In 
Advantoum Oven over another, 
use the dimensions 
shown. The middle rail 
separating the two openings may need to be larger 
than the 2Ǝ minimum shown.
PREPARE THE OPENING (CONT.)
Installation under a Microwave Oven and over 
a Warming Drawer:
30Ǝ
23-1/2Ǝ
25-1/4Ǝ
17-1/2Ǝ
2Ǝ Min. 
(3Ǝ Recommended)
Per Microwave 
Oven Requirement
3.5Ǝ Min.  
(4.5Ǝ Recommended)
Per Warming 
Drawer 
Requirement
Construct  
solid bottom - Min. 
3/8” plywood 
supported  
on all four sides. 
Must be able to 
support weight 
of oven and 
contents.
NOTE: Additional clearances between the cutouts 
may be required. Check to be sure the oven supports 
above the Warming Drawer location do not obstruct 
the required interior depth and height. See Warming 
Drawer installation instructions for details.
CAUTION
 For personal safety, the 
mounting surface must be capable of supporting the 
cabinet load, in addition to the added weight of the 
oven and drawer, plus additional oven loads.










