Installation guide
6 31-2000354 Rev. 0
Standard Installation Preparation
PREPARE THE OPENING (CONT.)
Installation over a Wall Oven:
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” Recommended)
45-1/4”
Min.
Construct  
solid bottom 
- Min. 3/8” 
plywood 
supported  
on all four sides. 
Must be able to 
support weight 
of oven and 
contents.
Per Oven 
Requirement
• If you are replacing an electric double oven with the 
combined installation of an Advantium Built-In Oven 
and a single oven, use the dimensions shown. The 
middle rail separating the two openings may need to 
be larger than the 2” minimum shown.
PREPARE THE OPENING (CONT.)
Installation over a Wall Oven and Warming 
Drawer:
Construct 
Solid Bottom 
Min. 3/8” 
Plywood 
Supported 
by  
2x4 or 2x2 
Runners all  
Four Sides
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
Per Oven 
Requirement
45-1/4” 
Min.
Per warming drawer requirement
2” Min.  
(3” recommended)
NOTE: Additional clearances between the cutouts 
may be required. Check to be sure the oven supports 
above the Warming Drawer location does not obstruct 
the required interior depth and height. See Warming 
Drawer installation instructions for details.
CAUTION
 For personal safety, the 
mounting surface must be capable of supporting the 
cabinet load, in addition to the added weight of the 
oven and drawer, plus additional oven loads.










